First Flagship Axes workshop Invitation Letter – Flagship Workshop Agenda – Flagship Workshop Second Flagship Axes workshop Agenda TEN-T Comprehensive Network in SEE SEETO Flagship Axes Initiative SEETO Technical Assistance – Flagship Project Danube Region Intermodal Strategy Facilitation of trade and BC procedures Flagship Broschures 1. Corridor Vc 2. Corridor VIII 3. Corridor X 4….
Category: Projects
REGIONAL TRANSPORT STUDY UPDATE – CONTACTS
Brian Smith Project Director and Technical Director
REGIONAL TRANSPORT STUDY UPDATE – OUR ROLE
Within the framework of developing an efficient South East Europe Transport Observatory (SEETO) Comprehensive Network and strengthening the underlying transport planning systems, a grant has been awarded by the Western Balkans Infrastructure Framework (WBIF) for the update of the Regional Balkans Infrastructure Study (REBIS), which is managed by the World Bank and was awarded to…
RWR/RSA – Project Workshops
Railway Reform Workshops 1st RWR_WS – February 2009 Belgrade, Serbia Agenda and List of participants FIRST WORKSHOP RAILWAYS AGENDA FINAL RWR WORKSHOP Attendants List Print Guest Presentation RWR Workshop – F Participants Presentations 1 RWR Workshop – ALB 1 RWR Workshop – CRO 1 RWR Workshop – KOS 1 RWR Workshop – MAK 1 RWR…
RWR/RSA – Project Results
Project Results RW Specific Result 3 – Draft Regulatory Manual (RM) for a harmonised infrastructure charging regime Specific Result 4 – Harmonised Network Statement for SEETO Participants Annex 1 – Standard RNE contract Annex 2 – RNE path request application form Specific Result 5 -Action Plan for Implementing Regulatory Manual and of Network Statement Specific Result 6 – Draft Regional Plan…
RWR/RSA – SHORT SUMMARY
“Support for Implementing Measures for South East Europe Core Regional Transport Network Multi Annual Plan (MAP) 2008-2012″ EuropeAid/125783/C/SER/MULTI The contract for the project was signed in June 2008 by a Consortium led by White Young Green Consulting (UK) which also includes TRADEMCO (Greece), VIENNA Consult (Austria) and TRL (UK). The project runs until November 2009….
Soft Measures
SEETO focuses on a few targeted areas of interventions which are identified in the SEETO Strategic Work Programme 2012-2014 as the SEETO Project Tasks for which continuous efforts and external support is needed. Those areas are: Railway Reform Border crossing facilitation Road Safety Auditing SEETO horizontal measures bring an added value to the infrastructure development…
For preparation
Priority projects for preparation Corridor/ Route/Node Regional Participant Name of the project Length (km) Foreseen source of funding (M€) Total estimated cost for project implementation (M€) Road projects Corridor VIII ALB Construction of Elbasan By-pass 13 45 ALB Construction of Tirana By-pass 17 90 Corridor X MAC Rehabilitation of the road section from Smokvica to…
Eligible for funding
01. Completion of motorway section Vukosavlje- Karuse 02. Completion of motorway section Karuse – Banlozi 03. Completion of Belgrade by pass, Sector 6: Strazevica-Bubanj Potok 04. Construction and reconstruction of sections Raec – Drenovo and Drenovo – Gradsko 05. Road connection to interchange Vucevica on Route 1 motorway 06. Expressway : Okučani – border BiH…
SEETO Comprehensive Network Projects
SEETO Comprehensive Network Priority Projects Two types of SEETO Comprehensive Network Priority Projects are identified: Priority projects eligible for funding – mature projects for which a comprehensive evaluation is available based on a completed feasibility study and, if available, additional full set of project documentation, in accordance with EU procedures for Programming and Procurement Rules. Priority…