10. Construction of motorway section Belgrade-Pozega on Route 4

Participant:
Serbia
SEETO No: SEETO CN position:
Route 4
Transport mode:
Road
Overall project objective:
The project aims to improve the level of service and traffic safety by upgrading the existing road to motorway standard and constructing a new highway section with all service facilities. The Ministry of Infrastructure started financing other Road Route 4 sections – Ub-Lajkovac, length 12,5 km, budget investment of 64 million euro and the section Lig-Preljina, length 40,36 km for an investment cost of 308 million euro (Azerbaijan Government contract).
Project benefits:
Together with the implementation of the project for Road Route 4 motorway construction in Montenegro, this project will provide improved connectivity between Serbia and Montenegro and facilitate connections from Belgrade to the port of Bar in Montenegro. Expected benefits are reduced VOC, travel times and accident costs.
Economic / Financial / Environmental indicators:
Environmental issues reviewed in the report are: geology and soils, surface and groundwater, air quality, noise, flora and fauna, landscape and visual impact, cultural heritage, population and economy. Environmentally sensitive areas (groundwater protection zone; surface drainage; residential areas; archaeological sites; agricultural land, shrub- and woodland) along the route have been identified. No biodiversity areas protected under national or international legislation have been identified. The use of natural resources – water resources, agricultural land and forests – has been reviewed.

EIRR: 10.89
OCK: 8%
ENPV/EURO: 279.822.384,00

Total cost (M€) 786
Section Type of work Length (km)
 Belgrade – Pozega  New  133.5

 